by Alethea | Dec 20, 2016 | Ship's Log
Most of our winter maintenance work happens on the lower two floors of the museum: in spar alley, the carpenter’s workshop, and the rig shop. Things are always crowded, but once Niagara is downrigged and all of her supplies are stored inside for the winter,...